Kevin Meyer
Published: Wednesday, November 30, 2016 - 17:35 “Excellent firms don’t believe in excellence—only in constant improvement and constant change.” The plan-do-study-act (PDSA) cycle is the core component of continuous improvement programs. You may have heard it called the plan-do-check-act (PDCA) cycle—and they are very similar—but I have come to prefer PDSA, with the A standing for “adjust,” for reasons I’ll explain shortly. Understanding the cycle and its application to continuous improvement is critical for leadership. But first, a history lesson.
In November 2010, Ronald Moen and Clifford Norman wrote a well-researched article, “Circling Back” in Quality Progress (November, 2010) that detailed the history behind PDCA and PDSA. The cycles have their origins in 1939, when Walter Shewhart created the specification-production-inspection (SPI) cycle. The SPI cycle was geared toward mass production operations, but Shewhart soon realized the potential application of the scientific method to problem solving, writing that “it may be helpful to think of the three steps in the mass production process as steps in the scientific method. In this sense, specification, production, and inspection correspond respectively to hypothesizing, carrying out an experiment, and testing the hypothesis. The three steps constitute a dynamic scientific process of acquiring knowledge.” At the time, W. Edwards Deming was working with Shewhart to edit a series of Shewhart’s lectures into what would become Shewhart’s Statistical Method from the Viewpoint of Quality Control, published in 1939. Deming eventually modified the cycle and presented his design-production-sales-research cycle in 1950, which is now referred to as the Deming cycle or Deming wheel. According to Masaaki Imai, Toyota then modified the Deming wheel into the PDCA cycle and began applying it to problem solving. In 1986, Deming again revised the Shewhart cycle, with another modification added in 1993 to make it the PDSA cycle, or what Deming called the Shewhart cycle for learning and improvement. (Deming never did like the PDCA cycle. In 1990, he wrote Ronald Moen, saying: “Be sure to call it PDSA, not the corruption PDCA.” A year later he wrote: “I don’t know the source of the cycle that you propose. How the PDCA ever came into existence I know not.”) The PDCA cycle has not really evolved in the past 40 years and is still used today at Toyota. The PDSA cycle continues to evolve, primarily in the questions asked at each stage. Although both embody the scientific method, I personally prefer the PDSA cycle, because “study” is more intuitive than “check.” Deming himself had a problem with the term “check,” as he believed it could be misconstrued as “hold back.” I also prefer “adjust” to “act,” as it conveys a better sense of ongoing, incremental improvement. Just be aware that some very knowledgeable and experienced people prefer the pure PDCA. Let’s take a look at each component of PDSA: It’s important to realize that the PDSA cycle is valuable at both process and organizational levels. For example, you start the plan stage of the PDSA cycle while evaluating your current state and creating a hoshin plan. As you execute the annual and breakthrough objectives of the hoshin plan, you move into the “do” quadrant. On a regular basis, you evaluate the hoshin plan and the results of the goals (study), then modify it as necessary for the next revision of the hoshin plan. This article is an excerpt from The Simple Leader: Personal and Professional Leadership at the Nexus of Lean and Zen (Gemba Academy LLC, 2016). Quality Digest does not charge readers for its content. We believe that industry news is important for you to do your job, and Quality Digest supports businesses of all types. However, someone has to pay for this content. And that’s where advertising comes in. Most people consider ads a nuisance, but they do serve a useful function besides allowing media companies to stay afloat. They keep you aware of new products and services relevant to your industry. All ads in Quality Digest apply directly to products and services that most of our readers need. You won’t see automobile or health supplement ads. So please consider turning off your ad blocker for our site. Thanks, Kevin Meyer has more than 25 years of executive leadership experience, primarily in the medical device industry, and has been active in lean manufacturing for more than 20 years serving as director and manager in operations and advanced engineering, and as CEO of a medical device manufacturing company. He consults and speaks at lean events; operates the online knowledgebase, Lean CEO, and the lean training portal, Lean Presentations; and is a partner in GembaAcademy.com, which provides lean training to more than 5,000 companies. Meyer is co-author of Evolving Excellence–Thoughts on Lean Enterprise Leadership (iUniverse Inc., 2007) and writes weekly on a blog of the same name.The Simple Leader: Plan, Do, Study, Adjust
Even Deming preferred PDSA to PDCA
—Tom Peters
Plan: Ask objective questions about the process and create a plan to carry out the experiment: who, what, when, where, and a prediction.
Do: Execute the plan, make observations, and document problems and unexpected issues.
Study: Analyze the data, compare it to expectations, and summarize what was learned.
Adjust: Adopt and standardize the new method if successful; otherwise, identify changes to be made in preparation for starting the whole cycle over again.
Our PROMISE: Quality Digest only displays static ads that never overlay or cover up content. They never get in your way. They are there for you to read, or not.
Quality Digest Discuss
About The Author
Kevin Meyer
© 2023 Quality Digest. Copyright on content held by Quality Digest or by individual authors. Contact Quality Digest for reprint information.
“Quality Digest" is a trademark owned by Quality Circle Institute, Inc.
Comments
PDSA
Thank you for this great article! I had always heard and believed that Deming preffered PDSA. Your article made clear the "why's".
I personally have finally risen to a point in my career where I am setting the standards and have switched all the companies current PDCA slides, and quotes to PDSA.
It's great to know I wasn't the only one who believed it should be Plan Do Study Adjust!
PDSA or APDS
Hi Kevin,
I prefer to use the cycle starting from the A point where A = Act = Review, so APDS
A = Act = Review the evidence to understand the problem and identify the causal factors and risks exposed (AD/ID, process performance info, Swiss Cheese Model as binary..BTW, my experience is that Ishikawa is useless..)
Plan = Design what to do to eliminate the causes and/or manage the risks
Do = Carry out the action plan, apply monitors,
S = In due course, study (analyse) the results of the monitoring vs the scope of the problem, then back to
A = Review the problem again...Is the problem under control or do we have to go around again?
I find it's a universal failing, part of the human condition, even, to come up with solutions to undefined problems..and it never helps, Dr Deming called it tampering.
Cheers
Ian
Great topic!
Too few people know this, these days. I hear lots of "PDCA," and when I bring up PDSA, I get a lot of weird looks. I can remember, though, someone asking Deming a question about "PDCA." He turned to someone next to him and asked "What was that he said?" a couple of times (Always a bad sign). Finally, he rose out of his chair and thundered, "It is P-D-S-A! Call it NOTHING else!"
People who think he came up with it tell me to check my references, but it's PDSA in both Out of the Crisis and The New Economics. Maybe it was PDCA in earlier writing...